Ribbon OEM Purchase Order & Contract Terms Guide — Securing Repeat Production (2026)

By Xiamen Smith Ribbon&Bow Co., Ltd. | Published November 11, 2026 | Category: B2B Sourcing & Contracts | Article #376

Table of Contents

  1. Why the First Order Is Not the Problem
  2. What a Ribbon Purchase Order Must Stand Alone
  3. Specification Control: One Document, Versioned
  4. Acceptance Criteria That Can Actually Be Measured
  5. Change Control: Where Most Repeat Disputes Actually Come From
  6. Defect Remedy: A Ladder, Not a Clause
  7. Protecting the Reorder Position
  8. Artwork, Tooling and Brand Asset Ownership
  9. Payment Terms, Incoterms and Title
  10. One Master Agreement and Many Purchase Orders
  11. What a Well-Drafted Order Looks Like From the Factory Side
  12. Where to Start If You Are Reviewing Your Terms Now
  13. Frequently Asked Questions

Why the First Order Is Not the Problem

Most procurement managers tell us that the difficult part of buying ribbon OEM is the first order, and in a narrow sense they are right. Finding a factory, agreeing a specification and getting a sample through approval is genuinely hard work. But in our experience, across many programmes, the first order is rarely where a private label ribbon business is lost. The first order is where a specification is agreed and a factory is chosen, and both of those things are visible problems with visible solutions.

The first order is also where the commercial relationship is least dangerous, because both sides are investing and both sides are watching closely. The sample is inspected, the colour is signed off, the carton is checked, the shipment is opened carefully. Nobody is yet living with the consequences of a drifting specification or an unpriced change, because there has not yet been a change.

What actually decides whether a private label ribbon programme holds together over two, three or five years is the paperwork that governs the second order and every order after it. This is where the specifications quietly change without anybody deciding to change them, where a defect becomes a negotiation instead of a remedy, where a supplier substitutes a material because the original became slightly more expensive, and where a brand discovers that the ribbon on its gift box is no longer the ribbon its packaging team approved. None of these things happens because a factory is dishonest. They happen because the terms that would have caught them were never written down.

This guide covers what to put in a ribbon OEM purchase order, what belongs in a master agreement instead, and how to write each clause so that it is measurable and usable in a dispute rather than merely present. The themes are specification control, acceptance criteria, change control, defect remedy and reorder protection, in that order, because that is the order in which they fail.

What a Ribbon Purchase Order Must Stand Alone

The test of a purchase order is simple and unforgiving: if it were the only document in the file, could both parties perform against it without needing to check an email? If the answer is no, the purchase order is a summary, and the summary is where the disagreement starts.

For a ribbon programme, that means the order should contain the following, either inline or by a specific attachment with a version number and date:

Two details are worth calling out. First, add a precedence clause stating that the attached specification annex takes precedence over any other document, correspondence or verbal agreement relating to the product specification. This single sentence resolves a large share of real disputes, because in the absence of precedence both parties genuinely believe their own understanding governs, and neither is unreasonable. Second, include the article or contract number that the order is issued under, so that the order is obviously part of a governed programme rather than a standalone trade.

Specification Control: One Document, Versioned

On a repeat programme, the specification should be a controlled document with a revision number, a date and a change log, held by both parties. The purchase order references the revision it orders against. This sounds like document control overhead, and for a small programme it is. But the alternative is worse: every order carries a fresh attachment, each attachment is worded slightly differently, and within a year the factory is producing against revision one, the brand's packaging team is approving revision three, and the merchandise manager is looking at a ribbon that nobody consciously changed.

In practice, a workable specification control regime has four elements.

Numbering. A simple scheme works: a programme code, then a revision number, then the date. The revision number should be referenced in the purchase order, on the carton label, on the inspection record and on the sample approval form. When a claim arrives, a single reference locates everything.

A change log. Each revision records what changed and why. A colour moved from one Pantone reference to another, the width tolerance tightened by 0.1 millimetres, the packing changed from a plain export carton to a retail-ready carton with a barcode, a decoration method changed from screen print to heat transfer. The log is the mechanism that stops a change becoming a surprise, and it is the first document anyone reads when investigating a defect that appears only on later shipments.

Written acknowledgement. Both parties sign or acknowledge each revision. This is the point of the process: the change is agreed rather than discovered. A buyer who changes a colour by phone and then forgets to update the file has created the exact situation the control is designed to prevent.

A stated consequence for unapproved changes. A revision that has not been acknowledged does not govern, and goods produced against it are subject to rejection or to a negotiated concession at the buyer's election. This is what makes the control real rather than decorative.

Acceptance Criteria That Can Actually Be Measured

Every dispute about ribbon quality is ultimately a dispute about measurement. The buyer says the colour is wrong, the factory says it matches the approved lab dip. The buyer says the width is short, the factory says the width is nominal. The buyer says the print is out of register, the factory says it is within tolerance. Both parties are describing the same reality from opposite ends, and without an agreed measurement method there is no way to resolve it except by argument, and argument is expensive for both sides.

Every acceptance criterion therefore needs three components. The characteristic, the tolerance, and the method.

For width: the width measured at one metre from the start of the roll, on a sample relaxed and conditioned for 24 hours at 20 °C and 65% relative humidity, shall be within the stated band. For thickness: measured under a stated load at a stated point. For colour: the shade shall fall within a stated Delta E of the approved lab dip, measured with a spectrophotometer under a stated geometry and illuminant, on the face and on the reverse, since ribbon is frequently viewed from both sides. For fastness: the named test standard with the stated exposure cycle, and whether the requirement is a colour change grade, a loss of grade, or both. For shrinkage and dimensional stability: the stated conditioning and measurement procedure, because a ribbon that is dimensionally stable in a temperate laboratory is not necessarily stable in a hot warehouse.

For printed decoration, the criteria that matter most are registration tolerance in millimetres, the minimum line or detail width that will be held, the density range for solid areas, and the adhesive or rub fastness requirement. For wire-edged or wired ribbon, add the wire material, gauge and placement. For bows and assembled trim, add the assembly length tolerance and the tension specification, because a bow that is five millimetres longer than approved changes the finished pack.

Where a characteristic genuinely cannot be given a number, describe the method and identify the reference sample, and specify a retained sample held by both parties. The retained sample is the simplest and most durable piece of evidence in the whole system: one physical piece of the approved ribbon, held by both parties, sealed, labelled with the revision number. Most quality disputes in this category can be settled in five minutes if there is an approved sample to put side by side with the disputed goods, and cannot be settled at all without one.

Change Control: Where Most Repeat Disputes Actually Come From

If you ask a factory team about the most common cause of a quality complaint on a repeat programme, the answer is rarely sloppiness in making the ribbon. It is a change that was made for a reasonable reason and never documented.

The changes that cause this are usually operational. The yarn supplier changed and the new yarn has a slightly different hand. The dye house moved to a different recipe because the original dyehouse closed. The screen for the third colour wore out and was replaced with a slightly different mesh. The cutting machine was re-geared for a wider product and the tolerance shifted. The packing carton changed because the old supplier stopped making them. The print was subcontracted to a different workshop for capacity reasons in the peak season.

Each of these is defensible at the point of decision. Each of them can move the product measurably. And under a purchase order that says only what the ribbon should be, none of them is a breach, because the ribbon still meets the written specification on paper. That is exactly why change control has to be contractual rather than implied.

A workable change-control clause requires the supplier to give written notice before making any change to a defined list of items: raw material source or specification, construction or yarn count, dye house or colour recipe, decoration method or the subcontracting of a decoration process, production site, tooling or screen, cutting or winding equipment settings that affect tolerance, and packing format. It requires the supplier to obtain prior written approval. It gives the buyer a defined period to respond, and states what happens if no response is received, because silence in a change-control process should not automatically mean consent. It gives the buyer the right to reject goods produced after an unapproved change, or to accept them at a negotiated concession. And it makes the record of approved changes part of the specification file, so the specification revision and the change log stay aligned.

The clause should also state the consequences of a change made without approval. If goods produced after an unapproved change arrive, the buyer should have the right to treat them as non-conforming, and the supplier should carry the cost of the resulting re-inspection, re-sorting or rejection. This is the part that makes the clause enforceable in practice, because a supplier who has never been asked to carry a consequence will not treat the obligation as real.

Defect Remedy: A Ladder, Not a Clause

Most defect clauses are written as a single sentence granting a vague right to remedies. That sentence is never used, because nobody can work out what the remedy is in the specific case. A ladder structure is far more effective, because it tells both parties exactly what happens at each level and moves the conversation forward instead of backwards.

A practical ladder runs in four steps. Level one: replacement or rework of the affected quantity at the supplier's cost, at the supplier's option where rework is technically feasible. Level two: credit against the next invoice for the affected quantity, where the buyer does not need the goods or cannot wait for them. Level three: a claim for the buyer's own reasonable consequential cost, where the defect was notified within the stated window and the required evidence was preserved. Level four: for persistent failure, the right to reduce the committed volume or to terminate the affected line only, with the rest of the programme unaffected.

Two clauses do most of the work in this area.

The notification window. State it in terms of arrival, not discovery. Arrival inspection cannot reveal everything: a shade difference visible only under a particular light, a fastness problem that only shows after a wash, a print registration issue that only matters on certain designs. A window tied strictly to discovery invites the supplier to argue that the buyer should have found it sooner, and creates an incentive to bury the problem. A window tied to arrival, generous enough to cover transit and normal receiving inspection, is the industry norm and the fair position.

The evidence standard. Require three things from the buyer, all of which are easy to produce and none of which should be missing: photographs showing the defect, the carton label showing the lot or batch number, and a physical sample from the affected lot. Give the supplier a defined period to respond, and permit a visit or a third-party inspection. The evidence standard protects the buyer from unsupported claims and protects the supplier from being asked to replace goods on a verbal report, and because it is symmetrical it is far less contentious to negotiate than an open-ended claim right.

On liability caps, we suggest two exclusions that experienced buyers generally insist on and that a good supplier will accept. The first is that the cap does not apply to the cost of the buyer's own rework, sorting or line downtime, since a supplier who is reliably within tolerance should not be exposed to an unlimited liability for a cap breach. The second is that the cap does not apply where the defect results from a deliberate substitution of material, tooling or production site without approval, because that is a breach of the change-control obligation rather than a quality variance, and treating it as a mere quality variance understates what happened.

Protecting the Reorder Position

Repeat production is where a good first order becomes a good programme, and it is where buyers most often find that they are negotiating from a weak position because they have not locked anything down in advance.

Three mechanisms protect the reorder position, and they work together.

Price validity and review. Fix the price for a stated period, then define the review mechanism precisely: which inputs may be used, how they are measured, over what window, and what happens if the parties cannot agree on a new figure. That last point is what most clauses omit and it is the point at which a price review becomes a hostage situation. A workable fallback permits the price to move by a stated formula regardless of agreement, so the review cannot block production.

Committed volume and capacity reservation. Distinguish between a forecast and a commitment, and use both. The forecast is indicative and helps the factory plan; it should not be binding on you. The commitment is a reserved share of mill capacity for a stated period, which protects your slot in the peak season when the ribbon trade is genuinely constrained, and which in exchange gives the factory a predictable base to schedule against. This is the single most valuable term in a peak-season programme, because the alternative to a reservation is a queue.

Specification freeze. The product you approved is the product you reorder, with any change requiring a formal revision, a cost check, and a requote if the cost moves. This protects you from silent drift and it protects the supplier from re-pricing work they have already absorbed, which is why it is usually agreed without difficulty when it is presented in that framing.

For programmes that run beyond a single year, these three belong in a multi-year agreement rather than in the purchase order. The purchase order should then carry only the things that genuinely change each time: quantity, price, delivery date, delivery basis and shipping instruction.

Artwork, Tooling and Brand Asset Ownership

Artwork is where brand assets are most often exposed, because the print file, the screen, the plate and the cutting die all live at the factory while the trademark, the copyright and the design all belong to the brand. A programme that runs for years will eventually end, and the ending is where the exposure becomes real: the supplier has a screen that carries your design, and the question of who may keep using it after the last order is not usually addressed in advance.

The terms should state clearly that the buyer owns the artwork and any registered trademarks, and that the screen, plate, die and any other tooling made specifically for the buyer's artwork are either the buyer's property or licensed to the buyer for the term of the agreement. Where the buyer wants ownership, the practical mechanism is a nominal tooling charge at the start of the programme with a written agreement that the tooling becomes the buyer's asset once that charge is paid, and a clause obliging the supplier to return it on request or on termination. Where the supplier retains ownership, the clause should still require that the tooling be used only for the buyer's orders, be stored so as to prevent misuse, and be returned or destroyed on termination at the buyer's election, together with written confirmation.

One further point is worth including because it is cheap to write and expensive to omit: any artwork or derivative file the supplier creates as part of the programme belongs to the buyer, and the supplier may not use it for another customer, may not offer a similar product to another customer, and may not retain a copy after the programme ends without the buyer's written consent. For a brand whose packaging is part of its identity, this clause protects something that cannot be replaced once it has been diluted.

Payment Terms, Incoterms and Title

These are the least creative parts of a ribbon supply agreement and the most frequently left to a template. Two points are worth more than the rest.

State the Incoterm with the named place and the version. Not FOB, but FOB Xiamen under Incoterms 2020, with the named terminal or port specified. "FOB" without a place is not a term, it is a negotiation. And the version matters more than people expect, because the allocation of costs and risk between seller and buyer changed at several points between Incoterms 2000 and 2020, and a term carried over from an older contract can quietly place costs on a party that did not expect them. If the price is on a delivered basis, state the destination with the same precision.

State when title passes. For cross-border supply, the buyer usually wants title to pass on shipment with the documents, and the supplier usually wants payment before shipping. These can be reconciled by separating the two: title passes on shipment against the agreed documents, payment is made against the documents and a retention or deposit arrangement. The point is that title and payment should be addressed explicitly, because the alternative is that the default rule applies, and the default rule is rarely what either side assumed.

Also worth stating: the currency of the quotation and of settlement, who bears the bank charges on each side, and whether the quotation is valid for a stated period. A quotation that is open-ended invites a supplier to withdraw it at an inconvenient moment and a buyer to complain about it later.

One Master Agreement and Many Purchase Orders

The structure that scales is a single master agreement per programme, with one purchase order per shipment. The master agreement carries the terms that do not change from order to order: the specification and its control regime, quality requirements, acceptance criteria, defect remedy, change control, artwork and tooling ownership, compliance undertakings, confidentiality and general liability. The purchase order carries the terms that change every time: quantity, price, delivery date, delivery basis, packing detail, carton marking and the named shipping instruction.

Repeating the quality and remedy clauses in every purchase order is not safer. It is more likely to produce inconsistent versions across a long programme, and it makes every order a negotiation because both sides re-read the entire document and treat each new copy as an opportunity to adjust. Keeping the two documents separate means the master agreement is settled once, carefully, and the purchase orders are short and mechanical, which is what lets a buyer place a reorder in minutes without reopening the commercial terms.

There is one exception. For a first order placed without a master agreement, the terms are best attached to the purchase order itself. Then, once a second order has been placed and delivered and both sides know how the relationship works, convert the terms into a master agreement. That sequence is worth doing deliberately rather than by accident, because it is far easier to negotiate a master agreement when both parties can point to a first shipment that went well.

What a Well-Drafted Order Looks Like From the Factory Side

It is worth saying what a good set of terms means to the people receiving them, because the reverse view explains a great deal. A purchase order with an attached, versioned specification tells us exactly what to produce, and removes the need to ask a series of questions by email and wait for answers. Acceptance criteria with measurement methods tell us how our work will be judged, which means we can self-check against the same criteria before shipping rather than hoping our idea of acceptable matches yours. Change-control terms mean we can tell you before we make a substitution, instead of after, which protects both of us: you get a real choice rather than a fait accompli, and we do not spend a week of engineering time producing a lot that gets rejected. A defect remedy with a ladder and an evidence standard tells us what happens if we get it wrong, which is the only way to have a conversation about fault that does not turn personal. And a clear specification freeze means the reorder you place in month eleven is the ribbon you approved in month one, so neither of us is managing a drift we both know is happening but nobody has named.

We are not especially good at defending ourselves against vague claims, and we would rather not have to. A programme where the terms are precise does not need a lawyer to interpret a tolerance, and it does not need a telephone call at midnight in the peak season to settle a question that should have been answered by a document. That is the whole argument for writing this section of the agreement carefully. It is not about being adversarial. It is about removing the arguments that have no technical content.

Where to Start If You Are Reviewing Your Terms Now

If you already have a ribbon supply agreement in place and you have not reviewed it in two years, the highest-value review is short and specific. Pull out the specification annex and check whether it has a revision number and a date. Then check whether the acceptance criteria state a measurement method, or only a tolerance. Then check whether there is any change-control clause at all. Then check whether the artwork and tooling ownership position is stated, or whether it is assumed.

Those four checks take under an hour and they cover, in our experience, the overwhelming majority of the disputes that a repeat programme eventually produces. You do not need to renegotiate the whole agreement to fix them. In most cases you can issue a supplementary specification document with a revision number, acknowledge it on the next purchase order, and add one or two clauses by a short covering letter that both sides sign.

A Practical Sequence for a Repeat Ribbon Programme

Here is how the pieces fit together in the order they normally need to be in.

Stage one, at first order. Attach a full specification annex to the purchase order with the acceptance criteria and the measurement methods. If there is no master agreement yet, put the quality requirement, the defect remedy and the artwork position in the purchase order as well. Do not skip this stage on the grounds that the order is small. The order size does not determine whether the paperwork is worth having; the number of reorders does, and the first order is the only point at which everything is still cheap to establish.

Stage two, at the second order. Formalise. Convert the terms into a master agreement, issue the specification as revision 1 with a change log, and establish the change-control notification process in practice rather than on paper only. At this point both parties have a shipped order to point to, which makes the negotiation considerably easier.

Stage three, from the third order. Add the forward-looking terms: the price review mechanism, the committed volume and the capacity reservation for the next peak season, and the reorder protection. These are much harder to negotiate later than earlier, because once the supplier has planned around your programme, asking for a reservation in the next season becomes a request for something they have already given away to someone else.

Stage four, at the annual review. Review the specification revision log, the change log, the defect records and the capacity position together, in one session. This is the moment to notice a drift that has been accumulating for a year — a shade that moved slightly on each of four changes, a carton that has been modified twice, a decoration that has quietly migrated to a subcontractor — and it is much cheaper to correct a drift than to unwind one.

What Changes When the Agreement Is Right

The measurable effect of a properly drafted ribbon OEM agreement is not fewer disputes; it is faster resolution of the ones that occur. A dispute over a shade difference that would otherwise take three weeks of emails and a shipment of samples back and forth is settled in one call, because both parties have the approved lab dip and a Delta E reading and the measurement method already agreed. A dispute over whether a substitution was authorised is settled by reading the change log. A dispute over a shortfall is settled by reading the packing list against the purchase order.

There is a second effect that matters commercially, and it is the reason experienced buyers invest real time in this. A factory that works under a clear, stable and enforced agreement is a factory that can quote you a firm price, commit to a delivery date, and hold that date. The uncertainty that comes from undocumented changes and open-ended remedies does not stay in the quality department; it works its way into the price, the lead time and the willingness to reserve capacity for you at the moment you need it. Good terms are not a cost. They are the price of a supplier who can commit.


Talk to Us About Your Ribbon Purchase Orders and Contract Terms

Smith Ribbon has been manufacturing ribbon, bows, tassels and decorative trim in Xiamen since 2004, with our own 15,000 m² factory, more than 200 employees, daily output of 100,000 metres, and certification including OEKO-TEX, FSC, BSCI, SEDEX/SMETA and ISO 9001. We ship to more than 50 countries and support OEM and ODM customisation from 1,000 metres, with small-batch runs from 500 metres.

Whether you are writing your first ribbon purchase order and want to know which clauses matter most for a repeat programme, need a specification annex template with acceptance criteria and measurement methods already built in, are rebuilding the commercial terms for an existing supplier relationship where the artwork and tooling position is unclear, or want a factory that works to a documented change-control and acceptance regime so that the price you are quoted is the price you get on the reorder, send us the product, the volume and the destination and we will tell you what we would write into the terms and where we can commit.

Email: xmmsd@126.com  |  Mobile / WeChat: +86 137 7995 1780  |  Office: +86-592-5095373

Frequently Asked Questions

These are the questions brand owners and procurement managers most often ask us about purchase orders and contract terms for ribbon OEM: what a purchase order must contain, how to write measurable acceptance criteria, how to handle change control, how to structure a defect remedy, and how to protect a reorder position. If your question is not here, ask us directly.

1. What should a ribbon OEM purchase order actually contain?

A ribbon purchase order is only useful if it is unambiguous without any reference to prior correspondence. In practice that means seven things: the full product specification attached as a numbered annex, the decoration method and colour count, the quantity split between the shipping lot and any held back for reorders, the tolerance and acceptance criteria for every measurable characteristic, the packing format including carton dimensions and maximum gross weight, the delivery basis with the named place and the requested date, and the price broken into unit price, setup, packing and any tooling separately. The most common failure is a purchase order that references an email thread and a sample, neither of which has a version number, which means the factory and the buyer can be working from two different documents at the same time without either noticing. Attach the specification as a signed annex with a revision number and a date, and make the purchase order state that the annex takes precedence over any other communication.

2. Should the specification be attached to every purchase order, or held in a master agreement?

Hold the technical specification in a master agreement or a controlled specification document with a revision number, and attach it to every purchase order by reference. Attaching the full document every time creates a versioning problem, because each attachment is a new copy that can drift, and a supplier who receives three differently worded versions of the same specification will reasonably ask which one governs. The cleanest discipline is one controlled document, versioned, with a change log, and each purchase order referencing the exact revision it orders against. This also makes change control simple: when the specification changes, you issue a new revision, both parties acknowledge it, and only purchase orders issued against that revision carry the change.

3. How do I write an acceptance criterion that can actually be measured?

Every acceptance criterion needs three components: the characteristic, the tolerance, and the method of measurement. Width is not an acceptance criterion; width within plus or minus 0.5 millimetres measured at one metre from the start of the roll on a relaxed sample conditioned at 20 degrees Celsius and 65 percent relative humidity for 24 hours is an acceptance criterion. Colour is not one either; the colour shall fall within a stated Delta E tolerance of the approved lab dip measured on a spectrophotometer under a stated geometry and illuminant is. Fastness is measured by a named standard with a stated exposure cycle, shrinkage by a stated method and conditioning, and defect rates by a sampling plan with a stated quality level. Where a characteristic cannot be given a number, describe the method and the reference sample, and identify the retained sample that both parties will hold.

4. What change-control terms should I include for a repeat ribbon programme?

Change control exists because most quality disputes on repeat programmes are not manufacturing faults at all; they are the result of an undocumented change. The supplier changed the yarn source, the dye house, the print screen, the cutting machine or the packing carton, and the product moved measurably while nothing in the paperwork changed. A workable clause requires written notice before any change to material source, construction, decoration method, tooling, production site, sub-contracted processes or packing format; the supplier's obligation to obtain the buyer's prior written approval for those changes; the buyer's right to reject goods produced without approval; and a written record, on the buyer side, of who authorised each change and when. The clause should also specify what happens to artwork files and tooling if the programme ends, because an uncontrolled change to a screen or plate is the mechanism by which a brand's own packaging drifts away from its approved artwork.

5. How should defect remedy and liability be structured in a ribbon supply agreement?

Structure the remedy as a ladder so that both sides know what happens at each stage rather than arguing at the point of dispute. A typical ladder runs: replacement or rework of the affected quantity at the supplier's cost; credit against the next invoice for the affected quantity; a claim for consequential cost where the defect was notified within a defined window and evidence was preserved; and then, for persistent failure, a right to reduce the committed volume or terminate for the affected line only. Two clauses do most of the work. First, a notification window tied to the arrival of the goods rather than to discovery of the defect, because inspection on arrival cannot reveal everything and a strictly short window rewards concealment. Second, an evidence standard: the buyer must provide photographs, the carton label showing the lot number, and a sample from the affected lot, and the supplier gets a defined period to respond. Liability should be capped, but the cap should exclude the cost of the buyer's own rework and should not apply where the defect is a deliberate substitution of an unapproved material.

6. How do I protect the price and the programme on reorders?

Protect the reorder position in three places. First, a price validity and review clause that fixes the price for a stated period and then defines the mechanism for review, including which indices or inputs may be used and what happens if the parties cannot agree on a new price, since a review clause without a fallback simply turns into a dispute at the worst possible moment. Second, a committed volume and capacity reservation arrangement: an indicative annual volume that the supplier plans capacity against, and a rolling forecast that is non-binding but which the supplier may not ignore when allocating mill slots. Third, a specification freeze, so that the product you approved is the product you reorder, with any change requiring a formal revision and a requote if the cost moves. Where a programme is genuinely long-running, these belong in a multi-year agreement rather than in the purchase order, and the purchase order should then govern only quantities, dates and prices.

7. Do I need a separate contract for every order, or is one agreement enough?

One master agreement governing the programme, with a purchase order per shipment, is the arrangement that scales and it is what we recommend. The master agreement carries the terms that do not change: specification control, quality requirements, acceptance criteria, defect remedy, change control, artwork and tooling ownership, confidentiality, compliance undertakings and general liability. The purchase order carries the terms that change every time: quantity, price, delivery date, delivery basis, packing detail and the named shipping instruction. Repeating the quality and remedy clauses in each purchase order is not safer; it is more likely to produce inconsistent versions across a long programme, and it makes every order a negotiation because both sides re-read the whole document. The exception is a first order placed without a master agreement, where the terms are best attached to the purchase order itself and then carried into a master agreement once the programme has a second order and a track record.